Radical workshop Reconstruction: Part 3
I had planned this weekend to get the ground ready. I am unfortunately not very successful and is still missing, a narrow strip which I then just put it in a week. It itches that is powerful in the fingers finally back to carpentry. The following image you can see the bed as it is inserted between the squares and removed.
So I work my rows with the OSB boards before laying the opposite wall. The 22mm thick panels are provided with tongue and groove. I Glue and screw it to the substructure of thermoplastic wood.
The dry bed of course, is irresistible to my two boys that I would like to introduce you to take this opportunity in the following figure.
0 comments:
Post a Comment