The drawers are glued and now it goes to the double where the bullet statements are attached. For this purpose I marked the positions of the double to the front frame and thus the left and right double come to the same height and level are, I use an auxiliary board which I put on the left and then right at the double. The board for the next lower double cut easily.
are then screwed the ball onto the double extracts. These were the double before the assembly, the required holes.
The drawers can now be put on the ball, and Excerpts are missing only the front doublers.
0 comments:
Post a Comment